213 lines
15 KiB
Markdown
213 lines
15 KiB
Markdown
# D-Bus source audit and Managed Overlay completion
|
|
|
|
Scope: current working sources, not the published image. Reference surface:
|
|
`../contracts/dbus/org.archipelago.System1.xml`. This is a source audit, not runtime
|
|
introspection or Polkit/VM acceptance. No method below has newly acquired runtime
|
|
acceptance through this audit. PackageKit is excluded by D-095.
|
|
|
|
## Method coverage
|
|
|
|
`Present` means an exported handler and the indicated backend exist. It does not
|
|
mean the full scenario has passed. Manager handlers are in `src/service/mod.rs`,
|
|
transaction handlers in `transactions.rs`, other interfaces in their named files.
|
|
|
|
| Interface / method | Source implementation / execution path | Assessment |
|
|
|---|---|---|
|
|
| Manager.GetCapabilities | Manager advertises durable-transactions, kernel-arguments, host-extensions, host-extensions-v1, local-package-import-v1 | Present; managed-overlays-v1 and packagekit-broker-v1 stay unadvertised |
|
|
| Manager.GetStatus | observation snapshot + transaction projection | Present |
|
|
| Manager.Refresh | Runtime worker → updates::managed | Present |
|
|
| Manager.GetUpdateDetails | plan_operation → managed::prepare, details-only | Present |
|
|
| Manager.PrepareUpdate | plan_operation → managed::prepare | Present; general overlay reapplication unfinished |
|
|
| Manager.Download | execute_operation → dispatch by plan intent | Present for update/extensions; overlay executor missing |
|
|
| Manager.Stage | same dispatch; plan-derived authorization | Present for update/extensions; overlay executor missing |
|
|
| Manager.GetTransaction | runtime exposes retained operation | Present |
|
|
| Manager.ListTransactions | journal pagination | Present |
|
|
| Manager.ValidatePending | observed pending deployment identity | Present; not a replacement for boot acceptance |
|
|
| Transaction.Cancel | initiator-aware authorization → journal cancellation | Present; worker observes cancellation boundaries |
|
|
| Transaction.GetSnapshot | durable record → wire snapshot | Present |
|
|
| Transaction.GetLog | ReadLogs authorization + bounded journal log | Present |
|
|
| HostExtensions.GetState | context-bound package catalog projection | Present |
|
|
| HostExtensions.Search | filtered catalog + bound pagination | Present |
|
|
| HostExtensions.Resolve | names/context → exact catalog entries | Present |
|
|
| HostExtensions.GetPackage | exact entry/context | Present |
|
|
| HostExtensions.GetHistory | successful staged generation records | Present |
|
|
| HostExtensions.RefreshCatalog | worker → packages::refresh_catalog | Present |
|
|
| HostExtensions.PrepareEnable | worker → packages::prepare_enable | Present |
|
|
| HostExtensions.ImportPackage | authorized Unix FD import → inputs | Present; pacman identity cross-check uses the image DBPath (`/usr/lib/archipelago/package-db`), never `/var/lib/pacman` |
|
|
| HostExtensions.PrepareChange | typed changes → packages::prepare_change | Present |
|
|
| HostExtensions.PrepareRestore | retained successful generation → prepare_restore | Present |
|
|
| ManagedOverlays.GetState | verified catalog state projection | Present; requires catalog |
|
|
| ManagedOverlays.ListAvailable | catalog filtering/pagination | Present |
|
|
| ManagedOverlays.GetOverlay | exact catalog identity | Present |
|
|
| ManagedOverlays.RefreshCatalog | worker → overlays::refresh_catalog | Present; producer/profile not deployed |
|
|
| ManagedOverlays.PrepareSet | exported handler → Runtime → overlays::prepare_set | Source implemented after audit; runtime acceptance pending |
|
|
|
|
Manager StatusRevision, HostExtensions/ManagedOverlays Revision, Transaction
|
|
properties and Finished are declared in source. ObjectManager registers the three
|
|
main objects and retained transaction exposure. PropertiesChanged emission exists
|
|
for the revisions. Actual signatures, signal timing, owner loss/reconnect and
|
|
permission behavior must be checked against runtime introspection in the pipeline.
|
|
|
|
## End-to-end client coverage
|
|
|
|
- `src/service/client.rs`: CLI status, update check/diff/plan/download/apply,
|
|
transaction list/status/log/wait/cancel, extension status/import/add/remove,
|
|
local/override/reset, enable/disable/history/restore call the typed service.
|
|
`extension add` accepts repository names, local archive paths and mixed
|
|
requests: each archive is imported through `ImportPackage` first, then one
|
|
`PrepareChange`/`Stage` applies the whole set. A path is recognised by `./`,
|
|
`../`, `/`, `~/` or a package suffix; `--file PATH` is the explicit form and an
|
|
unrecognised option fails instead of being treated as a name.
|
|
- ManagedOverlays CLI now has a separate proxy: status/list, add ID EXACT_COMMIT,
|
|
remove ID, order ALL_IDS and clear. Mutations fetch state/context, edit the
|
|
complete selection, invoke PrepareSet and then Manager.Stage. The exact commit
|
|
chooses the initial authenticated artifact; rebuild-on-update is still missing.
|
|
- `integrations/gnome-software/gs-plugin-archipelago.c` and
|
|
`integrations/discover/ArchipelagoBackend.cpp` implement native OS-update D-Bus
|
|
flows. These are OS clients, not overlay/package installation frontends.
|
|
- Existing client fixture/compile results do not prove communication with the
|
|
installed daemon, Polkit subjects, restart recovery or successful staging.
|
|
|
|
## Concrete integration breaks
|
|
|
|
1. PrepareSet now exports strict complete-list parsing, context/catalog checks,
|
|
authenticated input loading, composition/DB-accounting preflight and immutable
|
|
plan persistence. This is not yet an executable overlay Stage path; ALPM runtime
|
|
checks, lifecycle/replacement limits and pipeline acceptance remain open.
|
|
2. Manager now dispatches Overlays explicitly to overlays::execute; it validates
|
|
the retained plan/commit and calls the shared package Download/Stage executor.
|
|
3. PrepareSet now calls compose_tree/finalize, commits private managed output and
|
|
resolves retained extensions against it. The plan pins this composed target and
|
|
exact extension closure. Runtime validation of this new path is pending.
|
|
4. Whole-package replacements are explicitly rejected in composer.
|
|
5. Catalog transport expects the configured image remote to contain signed layer
|
|
and catalog commits. Producer/ref/profile rollout is unfinished.
|
|
6. RefreshCatalog unnecessarily scanned a full base. Removed during this audit;
|
|
load_base must instead be called by PrepareSet/Stage. Catalog listing must not
|
|
perform an OS composition preflight. Runtime latency remains unmeasured.
|
|
7. New lifecycle adapters and final package conformance still need completion;
|
|
inherited ALPM preservation alone does not implement new runtime actions.
|
|
8. PrepareUpdate now invokes declaration rebuild for retained overlays against the
|
|
verified target base, then prepares exact Host Extension reapplication and uses
|
|
the overlay executor. This requires the target base's versioned build policy;
|
|
policy provisioning, build tools/lifecycle coverage and runtime acceptance are
|
|
still incomplete. Capability remains disabled.
|
|
|
|
## Hardware enablement goal
|
|
|
|
Update semantics clarified by the user: rebuild selected declarations into new
|
|
Managed Overlay commits against the new common snapshot, then reapply Host
|
|
Extensions. Compatible prepublished layer commits are not a prerequisite for an
|
|
update. Source manifests/inputs are intentions; commit/lock identities describe
|
|
one resolved build. A generic YAML-overlay builder is still missing from builder;
|
|
the existing private Core/GNOME/KDE scripts do not implement this lifecycle.
|
|
|
|
The user's target is a reusable foundation for NVIDIA and other proprietary
|
|
hardware support. Current architecture models hardware adaptation as Managed
|
|
Overlays plus profiles selecting them; this audit does not introduce a fourth
|
|
LayerKind or declare a new architecture decision.
|
|
|
|
Required before claiming hardware readiness:
|
|
|
|
- Finish the generic complete-list PrepareSet → inspectable plan → Stage path,
|
|
including remove/reorder, update reapplication and rollback retention.
|
|
- Implement verified kernel binding: package archive identity, exact release and
|
|
ABI evidence. `artifact::validate_compatibility` currently rejects every kernel
|
|
binding. Removing that rejection without an evidence adapter is not a fix.
|
|
- Bind binary modules to the exact kernel, or execute reviewed DKMS inputs in
|
|
isolated staging; depmod precedes initramfs generation. Required failures abort.
|
|
- Carry firmware, userspace libraries and vendor configuration through ordinary
|
|
indexed package/file ownership. Version conflicts and file replacements remain
|
|
explicit; NVIDIA graphics/multilib integration needs profile-specific checks.
|
|
- Validate runtime units/tmpfiles/sysusers declarations and their target lifecycle;
|
|
installation must not mutate live /usr or silently reset administrator settings.
|
|
- Demonstrate atomic kernel+driver updates and failure preservation in the normal
|
|
pipeline. GPU behavior additionally needs relevant hardware or passthrough
|
|
evidence; a generic UEFI VM cannot prove NVIDIA acceleration.
|
|
- Secure Boot/module signing is outside the currently selected non-Secure-Boot
|
|
profile; do not advertise that support without its own implemented contract.
|
|
|
|
## Execution order after this audit
|
|
|
|
Run `20261109T034026Z` successfully staged nano; the next mc/htop preparation
|
|
terminated the service while encoding a transaction snapshot. `before` was forced
|
|
to a string array even for nonempty package records, also preventing journal replay.
|
|
Wire conversion now distinguishes populated package-record arrays from overlay
|
|
ordering strings; a regression test covers both signatures and mixed-array rejection.
|
|
Runtime and Rust-test confirmation await the next normal pipeline. No publication.
|
|
|
|
Run `20261109T014200Z` passed local package DB validation and initramfs generation.
|
|
Ownership validation rejected base /usr/bin/write (GID 5): the service checkout
|
|
had not run systemd-sysusers, unlike the legacy download path. Service install now
|
|
runs the same base sysusers initialization inside the isolated checkout before
|
|
install/validation. Host-versus-staging identity checks remain mandatory and factory
|
|
account files are restored before commit as before. Normal-pipeline confirmation
|
|
is pending; no release was published by this run.
|
|
|
|
Run `20261108T225854Z` passed JSON download and exact nano installation in the
|
|
private checkout. Validation then failed because `pacman -Dk` initialized the
|
|
runtime DownloadUser=alpm from pacman.conf, absent in this checkout. Post-install
|
|
local DB reason updates, consistency checks and inventory now use --config
|
|
/dev/null with explicit /usr/lib/archipelago/package-db, matching builder queries.
|
|
Repository download/signature checks remain in the package adapter. Confirmation
|
|
of validation/finalization and installed activation awaits the next normal run.
|
|
|
|
Run `20261108T202529Z` passed adapter builds and reached package download in Core
|
|
Stage, past the previous lock failure. The package command exited successfully but
|
|
its output failed JSON decoding. nspawn defaults to a read-only PTY for nonterminal
|
|
callers, multiplexing stderr (including download-mode pacman-key diagnostics) into
|
|
stdout. The package adapter now explicitly uses `--console=pipe` to preserve its
|
|
JSON stdout channel. Runtime confirmation awaits the next normal pipeline.
|
|
Failure diagnostics were collected, but their completion marker contained CRCRLF;
|
|
the probe now accepts repeated CR before LF rather than timing out after collection.
|
|
|
|
Run `20261108T173013Z` passed catalog signature checks, extension enable and nano
|
|
resolution. Stage then failed acquiring the compose lock. The read-only observer
|
|
also owns that lock for up to 10s plus 2s termination; mutation previously tried
|
|
only once. Mutation lock acquisition now waits at most 15s on contention; other
|
|
lock errors fail immediately, and external writers still exclude mutation.
|
|
Added contention/release and bounded-failure tests to the normal Rust test stage.
|
|
Runtime confirmation remains pending. Core failure diagnostics also renew sudo
|
|
credentials before fetching logs, since a long operation can expire the timestamp.
|
|
|
|
Retry `20261108T050444Z` reused the completed images in the normal pipeline and
|
|
captured authorized transaction logs. Catalog failure is in systemd-nspawn
|
|
(exit 1), but the worker retained only stderr; container console output on stdout
|
|
was lost. Failed workers now retain the bounded tail of both streams in private
|
|
GetLog diagnostics. This is a diagnostic fix; the catalog failure itself remains
|
|
unresolved until the next pipeline provides its guest error.
|
|
|
|
Run `20261108T000830Z` built all three ISO variants and passed Core installation,
|
|
boot, provisioning and login. Installed self-check failed on mtimes of the two
|
|
new package symlinks: OSTree does not retain their mtimes. CLI self-check now
|
|
captures strict pacman diagnostics in C locale and accepts only mtime warnings
|
|
for the two known aliases on an OSTree-booted host, independently verifying
|
|
their targets/type/root ownership/mode. Every other diagnostic remains fatal.
|
|
The package mtree and signatures are unchanged. Next normal pipeline must verify
|
|
this deployment-specific adaptation; no release was published by the failed run.
|
|
|
|
Normal run `20261107T230815Z` passed Rust and filesystem checks and both
|
|
Flatpak refreshes, then failed in the native GNOME fixture teardown: it skipped
|
|
GNOME Software 51's required `gs_plugin_shutdown_async()` before unref, leaving
|
|
an updates-changed source pending. The fixture now awaits shutdown and checks
|
|
its result before disposal. All update/download/stage/error assertions remain;
|
|
verification is pending the next normal release run. Failure evidence is archived
|
|
on terra under that run's `failure-evidence/` directory; nothing was published.
|
|
|
|
Compatibility requirement: existing installations must update through their
|
|
current signed image track without first acquiring new overlay metadata/policy.
|
|
Refresh/update age comparisons now use the retained clean upstream identity for
|
|
local overlay compositions; hosts without overlay metadata keep their old path.
|
|
Clean bases are signature-verified and retained in the sysroot repository.
|
|
The pipeline still needs an old-published-image → new-candidate upgrade scenario;
|
|
source fixtures and clean-install VM results cannot establish this transition.
|
|
|
|
1. Finish generic composition/lifecycle/replacement prerequisites needed by the
|
|
PrepareSet plan, with bounded inputs and indexed lookups.
|
|
2. Implement exported PrepareSet and immutable context-bound plans, then explicit
|
|
Overlays execution dispatch, commit/stage and extension reapplication.
|
|
3. Complete CLI/catalog producer/profile and migrate normal acceptance scenarios.
|
|
4. Close kernel ABI/module adapters against the hardware goal; retain explicit
|
|
unsupported errors until they have real evidence.
|
|
5. Run normal source/VM checks and publication workflow; record source SHAs,
|
|
signatures, installed behavior and remaining hardware evidence separately.
|